247
Awka Capital Territory Development Authority has commenced the pulling down of illegal buildings in Awka which do not have building permits and are violating basic building rules like blocking of access road and drainage way
In an exercise which was led by the MD Mr Ossy Onuko which took place in Umuogbu Area of Awka Town a 2 storey building which was blocking an access road and drainage was pulled down by the agency.
The Managing Director of the Agency Advised Developers to go through the right process of obtaining building approval before commencing construction, in order to ascertain if their proposed building can be allowed to stand in their proposed site so as to avoid situations like this