141
Information reaching us has it that work has advanced on the Box Culvert/ Flood control channel being constructed and the Mmiri Mgbo and Obiaja section of the Nkpor Umuoji Road which is located at the boundary of Nnobi, Uke and Ideani.
This is coming and the back of several rumors, viral videos and false narratives being pushed from certain quarters that the state government is using rods not heavy enough to carry construction of such magnitude but information reaching us with evidences has proven that the right materials are being used to undertake this project
Watch the videos and pictures attached for clearer understanding